Texas Rule 32: what may be flared or vented, and when an operator needs an exception
Statewide Rule 32 is the Railroad Commission of Texas rule on releasing gas to a flare or to the air. This page reads the rule text by subsection, then sets out what the Commission’s Form R-32 and monthly production report add to it.
This is general information. It covers Texas oil and gas wells under the Railroad Commission only, and it reads the rule, not any operator’s exception. It does not say whether a given release is allowed or whether an exception will be granted.
Statewide Rule 32, 16 Texas Administrative Code § 3.32, opens its general provisions with one sentence: all gas from any oil well, gas well, gas gathering system, gas plant or other gas handling equipment “shall be utilized for purposes and uses authorized by law, except as provided in this section” (§ 3.32(c)). What the rule provides comes in three layers. Some releases are exempt from the rule (subsection (d)). Some are authorized without an application, but only within stated limits of time, volume or gas recovery, and they are measured or estimated, reported and charged against lease allowable production (subsection (f)(1)). Anything past those limits needs an exception under subsection (h). An administrative exception “shall not exceed a period of 180 days,” and that limit does not apply to volumes of 50 mcf of hydrocarbon gas a day or less for each gas well, commission-designated oil lease or commingled vent or flare point (§ 3.32(h)(2) and (3)). An exception is issued to the operator and does not transfer when the operator changes. The 2020 and 2021 changes the Commission announced were to Form R-32 and to the instructions for the monthly production report, not to the rule text.
1What the rule covers
The rule reaches gas from “any oil well, gas well, gas gathering system, gas plant or other gas handling equipment”. It “does not apply to gas transmission or gas distribution facilities or operations” (§ 3.32(c)). Subsection (b) adds that activities the rule authorizes “may be subject to rules and regulations promulgated by” the U.S. Environmental Protection Agency under the federal Clean Air Act or the Texas Commission on Environmental Quality under the Texas Clean Air Act. This page stays on the Railroad Commission rule and does not cover those.
Subsection (a) defines five terms: fugitive emissions, gathering system, lease production facilities, low pressure separator gas and tank vapors. It does not define “flare” or “vent”. It does not define “casinghead gas” or “gas well gas” either, although both are in the rule’s title and “casinghead gas” appears in § 3.32(f)(2)(D). The statutory definition of casinghead gas is in Natural Resources Code § 86.002(10), which the statutes guide sets out.
In a July 2025 presentation, Commission staff put it in plain words: flaring is the “controlled burning of natural gas” and venting is the “release of natural gas to the atmosphere”. The same slides list the rule’s purposes as preventing waste, fostering conservation, protecting correlative rights and promoting the orderly development of the field. Those are staff descriptions, not rule text.
2Three layers of release
Commission staff sort releases into three types in their July 2025 slides: exempt, authorized, and authorized by securing an exception. The table below follows the rule text.
| Layer | What the rule says | Reporting and limits |
|---|---|---|
| Exempt§ 3.32(d) | Releases of gas “not readily measured by devices routinely used in the operation of oil wells, gas wells, gas gathering systems, or gas plants, such as meters”. The examples listed are tank vapors from crude oil, gas well condensate or salt water storage tanks (including makeup gas for gas blanket maintenance); fugitive emissions; amine treater, glycol dehydrator flash tank and/or reboiler emissions; blowdown gas from flow lines, gathering lines, meter runs, pressurized vessels, compressors or other gas handling equipment for construction, maintenance or repair; gas purged from compressor cylinders or other gas handling equipment for startup; gas released at a wellsite during drilling operations and before the completion date of the well; and gas released at a wellsite during initial completion, recompletion in another field or workover operations in the same field. The list is introduced with the words “include, but are not limited to”. | Not required by the Commission to be reported or charged against lease allowable production, and “not subject to the remaining requirements of this section” (§ 3.32(d)(1)). The Commission or its delegate may still require these releases to be flared if it determines flaring is required for safety reasons (§ 3.32(d)(2)). |
| Authorized, no application§ 3.32(f)(1) |
|
The released gas “shall be measured or estimated in accordance with” § 3.27 and “reported and charged against lease allowable production.” These releases are “subject to the requirements of subsection (e)” (flare or vent, section 3 below). |
| By exception§ 3.32(f)(2), (g)(2), (h) | Anything past the limits above needs an exception. For lease operations the operator has to present “information to show the necessity for the release” (§ 3.32(f)(2)). Releases from gathering systems, gas plants and other gas handling equipment not directly associated with lease production are handled in § 3.32(g). | Volume “measured or estimated” under § 3.27, “reported on the appropriate commission form” and “charged to the operator’s allowable production” (§ 3.32(f)(2)). Time limits and who holds the exception are in section 4 below. |
What counts as necessity on a lease
Section 3.32(f)(2) says the Commission or its delegate “may administratively grant or renew an exception”. It does not say the Commission must. Necessity for the release “includes, but is not limited to,” five situations:
- Cleaning a well of solids or fluids or both for more than ten producing days after initial completion, recompletion in another field or workover operations in the same field.
- Unloading excess formation fluid buildup in a wellbore for periods in excess of 24 hours in one continuous event or 72 hours total in one calendar month.
- Volumes of low pressure gas that can be measured with devices routinely used in oil and gas operations and that are not directed to a gas gathering system, gas pipeline, marketing facility or other authorized use “due to mechanical, physical, or economic impracticability”.
- “For casinghead gas only, the unavailability of a gas pipeline or other marketing facility, or other purposes and uses authorized by law”.
- Avoiding curtailment of gas production which will result in a reduction of ultimate recovery from a gas well or oil reservoir.
Item (D) applies to casinghead gas only, and it names the unavailability of a gas pipeline or other marketing facility. The Commission’s flaring FAQ adds that exceptions to flare from gas wells “are not typically issued as natural gas is the main product of a gas well.”
Gathering systems and plants have their own limit. The operator of a gas gathering system, gas plant, gas compressor facility or other gas handling equipment not directly associated with lease production “shall not intentionally allow gas to be released for a period of more than 24 hours after the start of an upset condition” (§ 3.32(g)(1)). An exception can be requested for longer, and the rule’s examples are construction, repairs or maintenance, a gas plant turnaround and emergency situations (§ 3.32(g)(2)).
3Flare or vent
Subsection (e) says which way an authorized release goes. The default for a release longer than 24 hours, unless subsection (d), (f)(1)(B) or (C), (g)(2) or an exception under (h) says otherwise, is that it “shall be burned in a flare if the gas can be burned safely.” A release of 24 hours’ duration or less “may be vented to the air if flaring is not required for safety reasons or by other regulation and the gas can be safely vented” (§ 3.32(e)(1)).
- An exception to vent a release longer than 24 hours can be granted “if the operator presents information that shows the gas cannot be both safely and continuously burned in a flare, and the gas can be safely vented” (§ 3.32(e)(3)).
- Even with an exception, “the commission or the commission’s delegate may require that the gas be flared if flaring is required for safety reasons” (§ 3.32(e)(4)).
- Releases must also be managed under § 3.36, the hydrogen sulfide rule (its current title is “Oil, Gas, Brine, or Geothermal Resource Operation in Hydrogen Sulfide Areas”), “when applicable” (§ 3.32(e)(2)).
4How an exception works
Subsection (h) says the Commission “or the commission’s delegate may administratively grant an exception authorized by this section provided that the requirements of this subsection are met.” Those requirements:
- Fee. The request comes with the fee required by § 3.78(b)(5) (§ 3.32(h)(1)). The amount is on the Form R-32 instructions.
- Length. An administrative exception “shall not exceed a period of 180 days” (§ 3.32(h)(2)). The 180-day limit “shall not apply for volumes of gas less than or equal to 50 mcf of hydrocarbon gas per day for each gas well, commission-designated oil lease, or commingled vent or flare point” (§ 3.32(h)(3)). “Requests for exceptions for more than 180 days and for volumes greater than 50 mcf of hydrocarbon gas per day shall be granted only in a final order signed by the commission” (§ 3.32(h)(4)).
- Emergencies. A request to cover “an operating emergency, system upset, or other unplanned condition” may be sent by facsimile or other means, if the signed original and fee are received by the Commission within three working days of the facsimile (§ 3.32(h)(5)).
- Who holds it. Exceptions are issued to the operator of a gas well or commission-designated oil lease or commingling point, and to the operator of a processing plant or other facility subject to the section (§ 3.32(h)(6)). They “are not transferable upon a change of operatorship.” The new operator has 90 days from the date the Commission approves the transfer to review existing exceptions and apply for a new one, and the existing exception “shall remain in effect during the 90-day review period” (§ 3.32(h)(7)).
- One application, many releases. One application, with one fee, can cover multiple releases from a full or partial shutdown of a gas gathering system, gas plant, gas compressor or other gas handling facility under (f)(1)(C) or (g)(1) (§ 3.32(h)(8)).
Renewals, changes and hearings
- The Commission or its delegate “may renew an exception,” and an administrative renewal by the delegate “may not exceed a period of 180 days” (§ 3.32(i)(1)).
- A renewal rests on a showing by the operator “that the conditions for which the initial exception or latest renewal was granted have not significantly changed despite a good-faith attempt by the operator to direct the gas to or utilize the gas for purposes and uses authorized by law” (§ 3.32(i)(2)).
- The renewal application and fee go in “21 days prior to expiration of the existing exception authority” (§ 3.32(i)(3)). If the operator files at least 21 days before expiration and the authority runs out before the Commission acts, the operator “is authorized to continue to operate under the existing authority pending final commission action” (§ 3.32(i)(4)).
- A request to amend an exception needs a new application “if the amendment will result in a material change of the previously granted exception.” Material changes include a change of operator and “an increase in volume of gas to be released or an extension of the duration of an exception greater than that provided for in subsection (h)” (§ 3.32(i)(5) and (6)).
- An operator “may request a hearing on any application for an exception or exception renewal,” and on a request for administrative approval that has been denied (§ 3.32(j)(1) and (2)).
Prairie Ridge Operating, a made-up company, holds an exception for its Sample No. 1 lease that expires Tuesday, December 15, 2026. Under § 3.32(i)(3) the renewal application and fee are due 21 days before that, on Tuesday, November 24, 2026. If it files that day and the exception runs out before the Commission acts, § 3.32(i)(4) lets it keep operating under the existing authority until the Commission decides. The subsection is written for filings made at least 21 days before expiration. It does not speak to a later filing.
If Prairie Ridge sells the lease and the operator changes, the exception does not go with it (§ 3.32(h)(7)). The buyer has 90 days from the Commission’s approval of the transfer of operatorship to review the exception and apply for its own, and the old authority stays in effect for those 90 days. Nothing here shows what the Commission would do with a real application.
5What an operator files and what shows in the record
Form R-32
The application is Form R-32, Application for Exception to Statewide Rule 32. The copy linked from the Commission’s forms page carries the effective date 11/04/2020. The Commission approved the revised form on November 4, 2020; it had been titled the Statewide Rule 32 Exception Data Sheet. Under the form instructions, the operator files with the Engineering Unit by hand delivery, by mail or by email, and a fee is required with each application, whether for a new exception, a renewal or a hearing request. The Commission’s May 2021 notice encourages filing through the RRC Online System and says hard copy filings continue to be accepted. The Commission also published an online filing guide for the form (version 1.1, September 2021).
The form asks for:
- the operator’s P-5 number, a 24-hour emergency contact number and a site name;
- whether it is a new exception or a renewal, and whether a hearing is requested;
- the producing property, by drilling permit number, gas ID number, oil lease number, surface commingle permit number or gas plant serial number, or “multiple properties” for a shutdown under § 3.32(h)(8);
- the number of flares and vents, and whether the property is connected to a gas gathering or transmission system and, if not, the distance to the nearest pipeline;
- the requested release rate in MCF a day and the requested duration, with an effective date and an expiration date or “permanent”;
- the method of gas measurement: orifice meter, turbine meter, mass flow meter, another meter or an estimate;
- for each flare or vent, its name, whether it is a flare or a vent, the release height and the location by district, county, latitude and longitude;
- whether the site is subject to Statewide Rule 36 (hydrogen sulfide) and, if so, the nearest public area within one mile;
- the necessity for the release, checked from the five § 3.32(f)(2) situations or from an “Other” list (insufficient gas gathering capacity, a system upset, scheduled or unscheduled maintenance); and
- the operator’s certification under Natural Resources Code § 91.143.
For a new exception, the instructions tell the operator to “Include an explanation of why the operations cannot be shut-in and the gas must be released” and to “Explain how all non-wasteful uses, including sales of gas and other beneficial uses, have been investigated and exhausted.” For the requested release rate they call for preliminary production data for the past 60 days, or the production history to date for a well that has produced for less than 60 days; the data is not required for gas plant exceptions. For the unavailable-pipeline necessity they call for “documentation of gathering/transmission pipeline availability, capacity and/or reliability limitations,” and plans to secure pipeline or plant capacity with “evidence of good faith efforts to obtain the same”.
For that same necessity, casinghead gas where a pipeline is unavailable, the form lists four requested forms of exception. They are on the form, not in the rule:
- administrative approval for 90 days, not to be renewed administratively;
- administrative approval for up to 180 days, in which flaring or venting is limited to 5 days per month;
- administrative approval up to 180 days if the gas volume flared is reduced by a flare reduction technology (the instructions ask for the type of release reduction technology and the anticipated percentage reduction, and, if it has not been implemented, the anticipated date of implementation); and
- a step-out (drilling in undeveloped areas), where the basis is a lack of infrastructure for the quality of gas or a 2-1/2 mile radius review for pipeline availability, with 90-day renewable administrative extensions for a maximum of 180 days.
The monthly production report
Flared and vented gas is also reported on Form PR, the monthly production report. Its instructions (the copy linked from the Commission’s forms page is dated 01/25/2022) say to “report all gas produced regardless of disposition,” including “test production and vented or flared gas”. In the casinghead gas and gas well gas disposition table, code 10 is “Flared,” code 11 is “Vented” and code 1 is “Lease or field fuel use”. For gas reported under code 10 or 11 the operator enters in REMARKS the authority for the release, with one or more of four two-letter codes: AR, authorized by rule; AE, authorized by exception; EP, exception pending; and EX, exempt. The Commission’s staff slides list the same four with the same labels. Lining them up with the layers in section 2 (EX with exempt releases, AR with releases authorized by rule, AE and EP with exceptions granted and pending) is this page’s reading; the instructions give the codes and their labels only. Section 3.32(d)(1) says exempt releases are not required by the Commission to be reported, and the instructions list EX as a code all the same.
The Commission said the new disposition codes 10 and 11 let it “quantify the legal disposition of gas that was flared and vented.” Its flaring FAQ says the Form PR must include actual, metered volumes reported at the lease level.
Where the public can look
The Commission’s Flare/Vent Exceptions (Statewide Rule 32) Query searches Form R-32 applications submitted on or after May 2, 2021, and for an approved exception it provides a PDF of the authorized exception information.
6Where the Commission’s papers differ
Two of the terms in the table are in the rule text: the ceiling of 180 days on an administrative exception (§ 3.32(h)(2)) and the filing deadline after a shutdown release (§ 3.32(f)(1)(C) and (g)(2)). The 7 and 14-calendar-day terms, the 45, 60 and 90-day exception terms, the 5-days-a-month limit, the step-out and a “permanent” exception appear only in Commission documents from different years or in the form, not in § 3.32.
| Question | Source and date | What it says |
|---|---|---|
| Filing after a shutdown release | The rule, § 3.32(f)(1)(C) and (g)(2) | The request is filed “by the end of the next full business day following the first 24 hours of the release unless the deadline is extended by the commission or the commission’s delegate.” |
| Filing after a shutdown release | Notice to Operators, March 2020 | After the governor’s March 13, 2020 disaster declaration: notify the district office within seven calendar days of the start of the release, and file the request by the end of the fourteenth calendar day after the first 24 hours. The notice says the Commission “will issue a Notice to Oil and Gas Operators when this extension of notification requirements under SWR 32 is terminated.” |
| Filing after a shutdown release | Commission staff slides, July 2025 | Under the heading “After the initial 24 hrs. of release,” notify the district office “no later than 7 calendar days,” and file within the 14th calendar day following the first 24 hours, each with a footnote citing a Notice to Operators dated March 13, 2020. (The March 2020 notice above is dated only “March 2020” and refers to the March 13 declaration.) The slides do not say from when the 7 days run; the notice says from the start of the release. Nothing in the documents opened for this page says whether that notice has ended. The Commission’s Notices to Operators list, checked September 29, 2026, shows no later notice on the Rule 32 notification extension. |
| Filing after a shutdown release | Notice to Operators, May 2021 | The notice on online filing of Form R-32 says the form “must be filed with the RRC by the end of the next full business day following the first 24 hours of the release unless the deadline is extended by the RRC or the RRC’s delegate.” It does not mention the March 2020 notice. |
| How long staff issue an exception | Flaring FAQ on the Commission site (undated; its counts run through fiscal year 2022) | Staff issue flare exceptions “for 45 days at a time, for a maximum limit of 180 days.” |
| How long staff issue an exception | Online filing guide, September 2021 | Staff issue exceptions “for up to 90 days at a time, for a maximum limit of 180 days.” |
| How long staff issue an exception | Commission staff slides, July 2025 | “60-day exceptions for wells connected to pipelines,” renewable administratively for a total of up to 180 days, and “90-day exceptions for wells not connected to pipelines”. The slides also say a volume of 50 mcfd or less “may request permanent exception”. |
| Requested form of exception | Form R-32, effective 11/04/2020 | For the casinghead gas necessity where a pipeline is unavailable, the form lists 90 days, not renewed administratively; up to 180 days with flaring limited to 5 days per month; up to 180 days with a flare reduction technology; or a step-out. The form also has a “permanent” box for the expiration date. |
7What changed in 2020 and 2021
The rule text did not change in those years. The source note on § 3.32 lists adoption effective December 4, 1996 (21 TexReg 11367) and amendments effective July 10, 2000 (25 TexReg 6487) and September 1, 2004 (29 TexReg 8271), and then an amendment published in the February 14, 2025 issue of the Texas Register (50 TexReg 835). The Commission’s adoption document for that 2025 amendment (a January 29, 2025 staff memo with the adoption preamble and rule text) marks every subsection of § 3.32 “(No change.)” except § 3.32(e)(2), which now names Rule 36 as “Oil, Gas, Brine, or Geothermal Resource Operation in Hydrogen Sulfide Areas”. The preamble says the amendments to §§ 3.1, 3.5, 3.7, 3.12, 3.13, 3.16, 3.17, 3.32, 3.36 and 3.73 “add references to brine resources and spent brine return injection wells as applicable or otherwise clarify requirements of those sections related to brine production and injection.”
What did change was the paperwork. The Commission’s November 9, 2020 news release says the commissioners’ action “made changes to the application for flaring exceptions, not to the state’s flaring rule (Statewide Rule 32).”
- March 2020Notice to Operators extends Rule 32 notice and filing deadlines during the COVID-19 state of disaster.
- November 4, 2020Commission approves the revised Form R-32.
- May 2, 2021The first day of applications the Rule 32 exceptions query covers.
- September 1, 2021Form PR disposition code 4 (vented or flared) is discontinued for cycle months of September 2021 and later. Code 10 (flared) and code 11 (vented) replace it. The Commission adopted the revised Form PR instructions on February 23, 2021.
- January 1, 2022The two-letter authority codes in REMARKS are required for gas reported under codes 10 and 11.
- February 2025Cross-reference in § 3.32(e)(2) amended to the current title of Rule 36.
8Where this meets a gas-to-power screen
The rule and its form speak to putting gas to use in a few places. The rule’s general provisions require gas to be “utilized for purposes and uses authorized by law”. A renewal rests on a “good-faith attempt by the operator to direct the gas to or utilize the gas for purposes and uses authorized by law.” The Form R-32 instructions ask how “all non-wasteful uses, including sales of gas and other beneficial uses, have been investigated and exhausted.”
The rule text does not mention engines, generators, electric power or computing, and it does not say how an exception’s volume changes if part of the gas goes to a use. The statutes that list what gas may be used for are set out in the statutes guide.
Exceptions are issued to the operator of the well, lease, commingling point or plant (§ 3.32(h)(6)), and Form R-32 is signed under the operator’s certification. The home page form takes the facts that bear on a use of the gas: the rate, the gas analysis if there is one, the county and who owns the surface.
9Sources
Last checked . Each page below was opened that day. The rule text comes from two copies that match line for line except for the 2025 cross-reference: the Legal Information Institute copy, which carries the February 2025 source note, and the printed copy on the Commission’s site, which predates that amendment. The Secretary of State’s Texas Administrative Code is the official text. Its old viewer address now shows a “Site Has Moved” notice. The new portal’s landing page loads, but its View TAC page rendered empty when this page was checked, so the text here has not been compared with the official copy. Rules and agency pages change.
- 16 Tex. Admin. Code § 3.32, Legal Information Institute copyFull rule text; source note through the February 2025 amendmenthttps://www.law.cornell.edu/regulations/texas/16-Tex-Admin-Code-SS-3-32Opened September 29, 2026
- Railroad Commission of Texas, Statewide Rule 32 flaring handoutPrinted copy of § 3.32 with its earlier source note (through the 2004 amendment)https://rrc.texas.gov/media/wftn5jh5/statewide-rule-32-flaring-handout.pdfOpened September 29, 2026
- Railroad Commission of Texas, adoption of amendments to Chapter 3 rules, staff memo of January 29, 2025 with the adoption preamble and rule textAmendments to Chapter 3 rules including § 3.32(e)(2); the “(No change.)” markings; the statement of what the amendments do. The February 14, 2025 Texas Register date comes from the Legal Information Institute source note.https://www.rrc.texas.gov/media/aqjbcmbs/adopt-new-3-82-amend-ch3-various-brine-01192025-sig.pdfOpened September 29, 2026
- Railroad Commission of Texas, Form R-32, effective 11/04/2020What the application asks; the requested forms of exceptionhttps://www.rrc.texas.gov/media/jekdiczs/r-32-fillable.pdfOpened September 29, 2026
- Railroad Commission of Texas, Form R-32 instructionsWhere to file; documentation asked for; fee statementhttps://www.rrc.texas.gov/media/lnrjpuut/r-32-instructions.pdfOpened September 29, 2026
- Railroad Commission of Texas, Oil and Gas forms pageLinks to the current Form R-32, its instructions and the Form PR instructionshttps://www.rrc.texas.gov/oil-and-gas/oil-and-gas-forms/Opened September 29, 2026
- Railroad Commission of Texas, announcement of November 4, 2020Approval of the revised Form R-32https://www.rrc.texas.gov/announcements/110420-rrc-approves-revisions-to-form-r-32Opened September 29, 2026
- Railroad Commission of Texas, news release of November 9, 2020The statement that the action changed the application, not the rulehttps://www.rrc.texas.gov/news/110920-rrc-conference-flaring-action/Opened September 29, 2026
- Railroad Commission of Texas, Notice to Operators, March 2020Extension of notification requirements under Statewide Rule 32https://www.rrc.texas.gov/media/kpujgkls/nto_state-disaster-swr-32_og_3-19-2020.pdfOpened September 29, 2026
- Railroad Commission of Texas, Notice to Operators, May 2021, Form R-32 online filingThe statement of the filing deadline; hard copy filings still acceptedhttps://www.rrc.texas.gov/media/anop0f2e/2021-notice-to-operators_swr-32-online-system_final_4-29-2021.pdfOpened September 29, 2026
- Railroad Commission of Texas, Oil & Gas Notices to Operators listThat the list shows the March 2020 and May 2021 Rule 32 notices and no later notice ending the March 2020 extensionhttps://www.rrc.texas.gov/oil-and-gas/publications-and-notices/notices-to-operatorsOpened September 29, 2026
- Railroad Commission of Texas, staff presentation on Statewide Rule 32 exceptions, July 2025Plain-language terms, purposes, and staff descriptions of notice, filing and exception termshttps://rrc.texas.gov/media/mfbl4out/statewide-rule-32-exception-to-flaring-venting-of-produced-gas-seyed-k-mahjour.pdfOpened September 29, 2026
- Railroad Commission of Texas, Form PR instructions dated 01/25/2022Reporting all gas produced; disposition codes 1, 10 and 11; the REMARKS authority codeshttps://www.rrc.texas.gov/media/mxcpw5vn/form-pr-instructions-01-25-2022.pdfOpened September 29, 2026
- Railroad Commission of Texas, announcement of March 2, 2021Adoption of the revised Form PR instructions; the January 1, 2022 date for the REMARKS codeshttps://www.rrc.texas.gov/announcements/030221-rrc-adopts-revisions-to-form-pr-monthly-production-reportOpened September 29, 2026
- Railroad Commission of Texas, announcement of August 30, 2021Implementation of the revised Form PR instructions; adoption on February 23, 2021; the statement about quantifying flared and vented gashttps://www.rrc.texas.gov/announcements/083021-implementation-of-rrc-revisions-to-form-pr-monthly-production-reportOpened September 29, 2026
- Railroad Commission of Texas, Flaring Regulation FAQExceptions for gas wells; monthly reporting of flared volumes; the 45-day descriptionhttps://www.rrc.texas.gov/about-us/faqs/oil-gas-faq/flaring-regulationOpened September 29, 2026
- Railroad Commission of Texas, About the Flare/Vent Exceptions (Statewide Rule 32) QueryWhat the public query covers and from what datehttps://rrc.texas.gov/resource-center/research/research-queries/about-swr32-queryOpened September 29, 2026
- Railroad Commission of Texas, Exception to Statewide Rule 32 Online Filing (Form R-32) external user guide, version 1.1, September 2021That an online filing system exists; the description of staff-issued exception termshttps://www.rrc.texas.gov/media/qpkdakmm/swr32-external-users-guide.pdfOpened September 29, 2026
Have gas that is flared or waiting on a line?
This form takes the rate, where the gas goes now, the county and who owns the surface. One of our landmen reads what you send and replies by email or phone. Sending it does not file anything with the Railroad Commission.